The lifecycle the City says it has not settled
The RFP states it directly: the City is holding a controlled testing posture while it determines how agents should be requested, approved, tested, deployed, monitored, supported and retired. Policy 2.2 governs tools that people use. An agent acts. That is a different problem, and it is the one standing between the City and most of the portfolio.
Why this comes before the use cases, not after
Three of the near term use cases need nothing more than published content and an approved tool. They can run inside Policy 2.2 as written. Everything beyond them, and every agent, waits on the lifecycle below existing. Building it in the first quarter is not governance for its own sake; it is what unblocks the rest of the two years.
| Stage | Who owns it | What happens, and why |
|---|---|---|
| 1. Request | Anyone in any department | One route, through the helpdesk option Policy 2.2 section 7 already names. An idea with no route becomes a shadow tool. |
| 2. Screen | Information Technology | Is it AI at all? Is the tool approved? Does it touch data section 8.1 excludes? Most requests end here, quickly, which is what makes the queue bearable. |
| 3. Data and permission approval | Data owner plus IT security | What exactly will it read, and who already has the right to read that? For Copilot this is the whole question, because it surfaces what the user can already reach. |
| 4. Risk review | IT, Clerk, and the owning department | Records, open records, bias, accuracy, public-facing content, consequential decisions. Proportionate: a drafting assistant is not a work order agent. |
| 5. Test | Owning department with IT | Against real cases, with a measure agreed before the test, not after. |
| 6. Decision gate | Named approver | Approved, approved with conditions, or not. Written down. A decision nobody recorded is a decision that gets remade. |
| 7. Deploy | Information Technology | Who supports it, who pays for it, what it is called, where it is listed. |
| 8. Monitor | Owning department | Against the measure. Reported, not assumed. |
| 9. Review | Named approver, on a date | Policy 2.2 asks for AI uses to be periodically reconsidered. This is where that happens. |
| 10. Retire | Information Technology | Switch it off, remove the permissions, keep the records. Most AI programs have no way to do this, which is why they accumulate. |
Proportionality, so the queue does not become the obstacle
A governance process that treats a drafting assistant like an agent with write access will be routed around within a month. ECI would propose three paths through the same ten stages:
- Light. An approved tool, public or internal non-sensitive content, output reviewed by a person. Screen and decide, days not weeks.
- Standard. Personal or regulated data, or output that reaches the public. Full data and permission approval and risk review.
- Agent. Anything that takes an action or writes to a system of record. Every stage, a named approver, a review date set at approval, and a documented way to switch it off.
The records question runs through all of it
Policy 2.2 section 8.4 requires users to retrieve and provide the prompts and inputs they used when the City Clerk asks. Georgia's open records obligations do not pause for a new technology. Before the City scales anything, it needs one answer to a simple question: when the Clerk asks what a staff member asked Copilot in March, who produces it, from where, and how long does it take?
ECI would answer that question in the first quarter, because the answer decides how fast everything else can move.